Pricing for a full junior school eicr

I know its difficult without visiting site but its a medium size school, electrical installation is in a reasonable state, approx 35 years old in oldest areas, circuits mostly labelled, gets tested every 5 yearsreguarly apparently so i dont hopefully foresee many big problems

11 single phase boards between 6-12 way
12 three phase boards between 4-12 way
1no. MCCB panel board 4 way
Approx 280 individual circuits
Apparently previous paper work is availiable

Work will be undertaken between 3-6pm one or two days per week until complete

Much appreciated?
 
I’d be going in about £4k+vat assuming it’s in good condition, with circuit charts etc.

However I have never priced an EICR that large before and I’m only a small business with low overheads so could be off the mark due to both reasons. I’d probably be asking for advice her too, so interested to see what else comes back.
 
I’d be going in about £4k+vat assuming it’s in good condition, with circuit charts etc.

However I have never priced an EICR that large before and I’m only a small business with low overheads so could be off the mark due to both reasons. I’d probably be asking for advice her too, so interested to see what else comes back.

I worked it out to £4550 so were pretty close

I didnt want to say before as i thought it was a bit toppy, but theres alot of work there
Thanks
[automerge]1580195994[/automerge]
They aren't giving you much of a chance at only 3 hours a day, max of 2 days a week. Even if lots of sparks put on it its not going to be that productive.
Well i do have more time in the half terms etc

Theres no deadline and it billable monthly, so im not really bothered, i dont fancy doing more evenings than that anyway as i like to be indoors for 4pm usually ?
[automerge]1580196141[/automerge]
work out per curcuit plus two days paper work and you have cracked it
Thats kinda how i was working it out but rather in days/dis boards rather than circuits/hours?
 
I was more concerned with my 4k +vat being a bit low. But then again I’m never too bothered about winning EICR’s. Unless I think it will lead to a lot more and better work in the future.
 
Don't rely on the previous paperwork being up to much. We're currently testing a very large primary school. We were given a copy of the EICR from five years ago and well over half the circuits on the test sheet just have "circuit not identified." The ones that do have test results must have been done from the van. The caretaker informed us that one electrician took 3 days to carry out the previous EICR and most of the time was spent sat in the van with his mobile phone!
 
I quoted for a school eicr last year.. large site over several buildings to be done during half term, they spent so long deciding who to use that by time they got back to me I had something else booked in I couldnt move.
I went in really high as it was unlabelled and a right mix of stuff. Apparently I was cheapest! secretly glad I didnt get it as I later heard who did and it turned into a pandoras box and took far longer than he planned.
 
I got asked to quote for some NHS periodic inspections in a couple of local health centres. Lots of previous paperwork from known reputable companies so I decided to come in low and try and get the work as it's easy enough to do. Only hassle is travelling and out of hours work.

I quoted £50 a board and £16 a circuit. To even come in with a chance of winning the work I had to drop to £40 a board and £8 a circuit, if I get the work I might just turn it down at that price.

Prices are getting silly and not even worth quoting for anymore, I know the next inspections done on those places will be from the van as they're driving past for a McDonalds breakfast.
 
I quoted £50 a board and £16 a circuit. To even come in with a chance of winning the work I had to drop to £40 a board and £8 a circuit, if I get the work I might just turn it down at that price.
So for a board with 30 single phase ccts…you'd have to get it done in a day normal hours.... and without paperwork
These people don't want it testing, they want a satisfactory report.
That's a joke and, considering the NHS factor, it's a disgrace. I wonder how much they'd pay for an emergency call out.
These days, some consider test and inspection a job for idiots.
It'd pay more to work as a porter, without the slightest worry in the world.
 
So for a board with 30 single phase ccts…you'd have to get it done in a day normal hours.... and without paperwork
These people don't want it testing, they want a satisfactory report.
That's a joke and, considering the NHS factor, it's a disgrace. I wonder how much they'd pay for an emergency call out.
These days, some consider test and inspection a job for idiots.
It'd pay more to work as a porter, without the slightest worry in the world.
Agree a ridiculous scenario to work to, ludicrous. plain daft, wouldn't even contemplate it, dumbing down our trade, or has that been done already?
 
I was more concerned with my 4k +vat being a bit low. But then again I’m never too bothered about winning EICR’s. Unless I think it will lead to a lot more and better work in the future.

Yes im the same, usually unless my first impressions are that the install is pretty new and up to scratch ill try and avoid eicr's anyway but its in a package of another £20k odd worth of work and they are a regular customers who pay well and quickly
 