Ok so the SWA must have fault
the 10 ohms shouldn't trip the RCD if that's the correct reading
it sounded like you have multiple joints ie Henley blocks so you could break the cable down and IR each length to find the problem
does that make sense
 
Sorry been kippin what tests are you carrying when the megger test button is fired??////
 
typical of you glensparks !!!! Just an a.. Hole troll did you recently have an a... Hole transplant which rejected you??
Tell you what don't respond to my posts just find a nice cliff and do the honorable thing you total w..er !!
Oh and if admin take offence get rid of idiots like him off this site.
lol....lol...
 
Redvanman in total excluding CU and final hot tub connection there are 3 IP66 boxes one on external wall some 3 ft from CU with 2 x single pole Henleys. One Central box located 3.5 metres from hot tub edge with 2 x double pole Henleys with split live to kill switch and then one IP 66 box installed inside hot tub to take termination of SWA. SWA goes from 2 boxes to CU and hot tub in 6mm T&E with additional 10mm earth to up the earth on the SWA.
I've checked every Henley all visible cable.
SWA is externally clipped around house at low level.
As I say it's probably obvious but at moment stumped me!!
Megger 1720 trips RCD before any RCD test whether on auto, individual tests even half test and ramp. In effect any load trips RCD but RCD absolutely fine on new 6 amp light circuit.
 
i,m confused. you say the RCD tests OK with no load and with a light circuit connected. so what load are you connecting to cause the problem?
 
I'd like to help too and whilst Glenns comments might feel harsh to the OP not using correct termination leads to misunderstanding. This thread would be so much shorter if people weren't having to ask for clarification on whats been done?

OP - if this is all run in SWA why are you using Henley blocks? Since when has a Henley block been IP66? At the Henley how are you dealing with the earth and armour? And can you answer Tels question?
 
I'd like to help too and whilst Glenns comments might feel harsh to the OP not using correct termination leads to misunderstanding. This thread would be so much shorter if people weren't having to ask for clarification on whats been done?

OP - if this is all run in SWA why are you using Henley blocks? Since when has a Henley block been IP66? At the Henley how are you dealing with the earth and armour? And can you answer Tels question?
Richy, Henleys used in IP66 adaptable boxes was how I read it.
 
Richy I've read many on Glens posts at best he's negative and tries to put most down.
So I said it as it is! There's a few trolls on this site who should really do the world a favour!!
 
Surely it's got to be the cable and that doesn't mean just the joints.
Like I said earlier break the joints down and test each cable and that will identify the problem
 
Richy I've read many on Glens posts at best he's negative and tries to put most down.
So I said it as it is! There's a few trolls on this site who should really do the world a favour!!
come on....i gave you a like for your earlier outburst....
 
as has been said...

identify the circuit causing the RCD to let go...

concentrate on that one....

it aint hard...is it...
 