nappit mate or muppet mate?
thanks its just because i done a eicr the other day and was told by my nappit mate that where before it would be a code 3 it is now code 2 and the test had failed
thanks its just because i done a eicr the other day and was told by my nappit mate that where before it would be a code 3 it is now code 2 and the test had failed
he didn't but i will be asking tomorrowWhich regulation number did he support the statement with when you asked him?
Code 3 if cables <50mm deep in walls if installation was post july 2008.
Maybe NAPPIT's own rules/regs?
I suppose I might give it a C2 (or even a C1) if the cables were run at a depth of less than 50mm in an area marked, "Nail gun testing area: all nail gun testers must ensure they are holding the supplied extraneous-conductive part with one hand and the nail gun with the other when testing the nail gun."