Hi all
I am working on a job and I am having trouble getting my head around it. Normal systems are fine but this is causing me a headache.
It is an S plan with an additional pump so both the DHW and CH have a pump and a valve, I know that the pumps have to be split due to it back feeding but I am not sure where to insert the relay in the circuit and what and where do i need to connect A1 and A2.
Ths is my first time doing a boiler system with relays for pumps so struggling with the working out of it. My initial thought was to use the motor connections in the valves (brown) to go across A1+A2 which would them allow me to split the oranges and pumps but the oranges still need to be connected together to send the switch line back to boiler to get it to fire....
Amy help would be appreciated as I think the wet pants are realising that I don't know how to connect it all up!!
Matt
I am working on a job and I am having trouble getting my head around it. Normal systems are fine but this is causing me a headache.
It is an S plan with an additional pump so both the DHW and CH have a pump and a valve, I know that the pumps have to be split due to it back feeding but I am not sure where to insert the relay in the circuit and what and where do i need to connect A1 and A2.
Ths is my first time doing a boiler system with relays for pumps so struggling with the working out of it. My initial thought was to use the motor connections in the valves (brown) to go across A1+A2 which would them allow me to split the oranges and pumps but the oranges still need to be connected together to send the switch line back to boiler to get it to fire....
Amy help would be appreciated as I think the wet pants are realising that I don't know how to connect it all up!!
Matt