Could the moderators or someone more computer literate organise a petition online? is this possible.

There's the government e-petitions website...

I'll have a look on there and if there's not already a petition going i'll set one up and post the link...
 
  • Like
Reactions: 4 people
Democracy sounds good but it looks like the Assosiation of Meter Operators have a strong lobby plus in this current economical climate politician will not vote for more costs to business no matter how cheap it is as macro economics take place so if you change 100,000 meters a year that a £1.2 million cost on you even although it will cost more to send someone out to put an isolator in the long run it makes common sense but because of deregulation there is big demarcation lines ie meter guys will only touch the meter and the head guys
will not work on the consumer side
 
Im sure there is a note with regard to pulling dno fuses in the BGB along the lines of ringing them telling them your pulling it and they need to re seal it , ( the phrase competent person is also in there) so assuming if your Nic elecsa etc pull away ???
 
Im sure there is a note with regard to pulling dno fuses in the BGB along the lines of ringing them telling them your pulling it and they need to re seal it , ( the phrase competent person is also in there) so assuming if your Nic elecsa etc pull away ???

See my post no. 80.
 
I will be sending a copy of that PDF from SSE to my MP, asking that all DNO's adopt that kind of sensible attitude towards isolation.
 
  • Like
Reactions: 1 person
I've set up a petition on the government e-petitions website.

It's got to be approved but as soon as i get the confirmation email I'll post up a link on here.

Wonder if the mods could promote it like the "Fatally Flawed" campaign...
 
  • Like
Reactions: 4 people
Sorry it's taking so long to get the link to the petition guys...

I'm still waiting for the email to say that it's been approved...
 
  • Like
Reactions: 1 person
Its an idiotic system
it should be compulsary for the suppliers to upgrade there equipment and provide a adequate means of isolation to allow improvements to be made such as fitting the CCU without breaking any laws or seals
Or allow the seals to be cut and new tails installed as long as the supplier is notified and temporary seals fitted upon completion as well as having to fit a DP isolator if the equipment looks safe to do so
 
  • Like
Reactions: 3 people
Its an idiotic system
it should be compulsary for the suppliers to upgrade there equipment and provide a adequate means of isolation to allow improvements to be made such as fitting the CCU without breaking any laws or seals
Or allow the seals to be cut and new tails installed as long as the supplier is notified and temporary seals fitted upon completion as well as having to fit a DP isolator if the equipment looks safe to do so

I think we would all be in agreement mate. Just been reading an article in the last ECA magazine saying how they have been lobbying parliament to get something sorted, and that the Government is on-board with finding a solution. I think the key is for us all to write to our MP, as this is a matter of safety.
 
  • Like
Reactions: 1 person
UPDATE...

Contacted e-petitions website yesterday to ask why my petition hadn't been finalised.

They said that as it was quite complex it might involve more than one government department so they were taking time to check it properly and make sure everything was ok.

I'll keep everyone updated and hopefully post up the link on here in the next few days...
 
  • Like
Reactions: 2 people
We would not need this if the Electrical Safety Council had got the government to either get the DNOsto fit an isolation switch or get one fitted in the new smart meters but nope the government were lobbied by the meter and DNO companies stating there was no need to put this extra cost or burden on to business as it was no a safety issue reference Switched On issue 25.

I have signed this but I feel big business has more of a say plus I returned to a job this morning to fix a socket and I had fitted an isolator when I changed the CU now there was 16mm singles coming from the meter but since then the meter and mains were renewed and they fitted an isolator now you are asking what 2 isolators YEP and worse than that they kept the 16mm singles as this was on the consumer side in.

The customer did ask saying the electrician had left enough DI cable going to the CU but no.So this morning it took me 10 minutes to put the DI cable straight into their isolator thus removing the one I fitted and the single 16mm.

Sorry no pics left camera in the house
 
We would not need this if the Electrical Safety Council had got the government to either get the DNOsto fit an isolation switch or get one fitted in the new smart meters but nope the government were lobbied by the meter and DNO companies stating there was no need to put this extra cost or burden on to business as it was no a safety issue reference Switched On issue 25.

I have signed this but I feel big business has more of a say plus I returned to a job this morning to fix a socket and I had fitted an isolator when I changed the CU now there was 16mm singles coming from the meter but since then the meter and mains were renewed and they fitted an isolator now you are asking what 2 isolators YEP and worse than that they kept the 16mm singles as this was on the consumer side in.

The customer did ask saying the electrician had left enough DI cable going to the CU but no.So this morning it took me 10 minutes to put the DI cable straight into their isolator thus removing the one I fitted and the single 16mm.

Sorry no pics left camera in the house

Just shows the average intelligence of these guys....
 
interesting point, when the old sangamo weston mechanical meter was removed at my house, it was replaced by a new digital meter WITH A BUILT IN ISOLATOR!, when it went faulty a couple of years later it was replaced by another digi meter, without an isolator, when I asked the guy, he just said, "we're not fitting those any more". It was the same make, just minus isolator. When the original digi meter was fitted, I asked the DNO man what the difference in price was, he laughed and told me the old black mechanical meters were about £70 each, whereas the new ones cost..........................."about £11"! So the "cost to much" excuse is a bit invalid then?
 
Yep the cost is a red herring but charging you anything from £80-£120 to fit one shows up on their bottom line
 
Any Sangamo time switch was expensive. Well made but you had to pay for that quality.

I used to like the ones with mechanical solar correction as used in Phone boxes and probably other locations as well.
 
Just giving an update on this thread..

Not much to say, but I contacted the DNO to fit an isolater..

Only had to speak to two people before speaking to the right person, which is ok.

Chap came out within 1 week to assess what needed doing and said he'd been given 2 quotes.. £45 and £80. Said he'd organise it and call me back.

Left it for another week, nothing heard, so I gave them a little push and someone is coming out this wednesday to fit the isolater for £65.

I'll let you know if they turn up :teeth_smile:
 
Just thought I should close this thread properly by giving an ending.

The chap turned up and fitted the isolater, simple.

Quite interesting seeing him remove the cut out though. He just pulled it out, no gloves, no checks, just pulled it out.

Now I can get on with my first CU change!
 
  • Like
Reactions: 3 people
Just thought I should close this thread properly by giving an ending.

The chap turned up and fitted the isolater, simple.

Quite interesting seeing him remove the cut out though. He just pulled it out, no gloves, no checks, just pulled it out.

Now I can get on with my first CU change!

I have never seen them use PPE either. It's always available, but doesn't seem to get worn...
 
Signed it.

The weasels in parliament are very switched on to people power in numbers, especially when the press get involved or if it could mean their jobs are at risk!

Apathy is the death of all progress, so if you can't be arsed signing the petition, then don't complain ever again about this predicament we electricians are faced with!
 
  • Like
Reactions: 3 people
Signed !
Can the moderators send a link / message to all members of the forum to inform them about this petition, so others can add their signature if they wish.
 
Signed !
Can the moderators send a link / message to all members of the forum to inform them about this petition, so others can add their signature if they wish.

This is a great idea. I don't know how many members this forum has, but if everyone signed the petition it would certainly help.
 

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

HappyHippyDad

Esteemed
Arms
Supporter
~
Joined
Location
Gloucestershire
If you're a qualified, trainee, or retired electrician - Which country is it that your work will be / is / was aimed at?
United Kingdom
What type of forum member are you?
Practising Electrician (Qualified - Domestic or Commercial etc)

Thread Information

Title
removal of main cutout fuse!
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
110

Advert

Thread statistics

Created
HappyHippyDad,
Last reply from
Guitarist,
Replies
110
Views
34,646

Advert