S
Stuuk1
I am the house owner and this form of hot water is being installed so that when the boiler packs up (as they so often do...) I will still be able to at least have a hot shower.
Someone earlier said about an extra bonding cable..?!
I was under the understanding that I only needed to bond the water and gas within 3 meters of where it enters the property?
There are now two plastic joints in the pipework which I will obviously bond across, there are no others. Although I will bind across the boiler pipes even though this isn't a requirement.
Could someone kindly confirm the above statements?
P.s. The house has a new split load RCD board with everything covered.
Someone earlier said about an extra bonding cable..?!
I was under the understanding that I only needed to bond the water and gas within 3 meters of where it enters the property?
There are now two plastic joints in the pipework which I will obviously bond across, there are no others. Although I will bind across the boiler pipes even though this isn't a requirement.
Could someone kindly confirm the above statements?
P.s. The house has a new split load RCD board with everything covered.