Hi Diilb. Sorry yes I've read the lot, and I wholeheartedly agree. Perhaps I wasn't being obvious there.

Point I was just making is if it were still free, then I'd have got it done. As it turns out I'll write a note on the EIC as a recommendation, and leave it at that.

Thanks for all the comments.
 
Nuff said. Make a note and sweep the cause of a possible problem under the carpet.

What has the customer had to say about this.
 
i tested a bungalow on tuesday as was all upgraded and they division of circuits was at its best and my diversity came out at 170A @ multyplying by .4. but look there was 4 sockets on kitchen ring , the bell had its own 6A all aplliances at its own 16A .. never gonna pull that. nearly 16 circuits and best of all the ze was 213 ohms added another rd and got it down to 160 ohms
 
I asked the mr niceic inspector about this maximum demand box on the eic. I said how do you work this out? he said and I quote "dunno"
 
With a hook up form the stair lighting in the close . :)

Jamie
The wee gas torch they carry in their van
I was doing a C.U. change in the middle of nowhere n the guy asked if I wanted a coffee Said to him give me 5 mins Ill stich my temp board on ( haddnt bothered with it at start) he said s ok n fired up wee gas stove then said If we run out of gas we can fire the genny up 1 double socket in kitchen marked up "SUPPLIED FROM GENNY" it was the behind the middle of nowhere along the road from the BackOf Beyond so they were use to power cuts
 
When I was cable jointing, the compound bucket would get shoved to one side when it was brew time / breakfast time / diner time. Well any time really.
We could be miles from anywhere in the middle of a field, I could guarantee our foreman would show up when the frying pan went on.
 

OFFICIAL SPONSORS

Back
Top