Re: Tell us about your faults !
yes Simon, thats what is worrying me
this bloke is installing central heating systems as well!
but it does take a bit of experience to learn about correct methods of installation
I have seen a few people that have taken these re training and part P course
they sail through the exams and stuff ( I found them hard even for an old sparkie) and then they do very odd things
recent finds on a new installation
1. roof joists drilled for cables / the joists are thin and there is plenty of room to run the cables along the purlins then 90 deg along the joists
2.partial rewire and new C/U found 3 old single gang sockets on wooden pattresses, the client complained the sparked if you walked near them when anything was plugged in
3.BS clamp on incoming sheath of company supply cabel ( old as well)
4. ring and lighting circuit cables zip tied to a gas pipe
5. new C/U fitted with a gas main pipe 28mm running against it and through the tails
6.threaded rod used as earth electrode???
7.external commando socket fitted for a pool, but it was an internal socket and no gland or sheath
8. SWA entering a 2 way consumer unit, the sheathing was not earthed, not glands fitted and the method of entry to the C/U was stunning, I will try and post a picture
But let's face it, it's not apprenticeship material we're talking here, it's primary school science!
Simon.
yes Simon, thats what is worrying me
this bloke is installing central heating systems as well!
but it does take a bit of experience to learn about correct methods of installation
I have seen a few people that have taken these re training and part P course
they sail through the exams and stuff ( I found them hard even for an old sparkie) and then they do very odd things
recent finds on a new installation
1. roof joists drilled for cables / the joists are thin and there is plenty of room to run the cables along the purlins then 90 deg along the joists
2.partial rewire and new C/U found 3 old single gang sockets on wooden pattresses, the client complained the sparked if you walked near them when anything was plugged in
3.BS clamp on incoming sheath of company supply cabel ( old as well)
4. ring and lighting circuit cables zip tied to a gas pipe
5. new C/U fitted with a gas main pipe 28mm running against it and through the tails
6.threaded rod used as earth electrode???
7.external commando socket fitted for a pool, but it was an internal socket and no gland or sheath
8. SWA entering a 2 way consumer unit, the sheathing was not earthed, not glands fitted and the method of entry to the C/U was stunning, I will try and post a picture