I do a full EICR before the board is removed from the wall.
Do you charge that separately, or is that inclusive of the price for a CU change?
I only ask, as some, for an EICR, appear to charge fixed price & in addition price per circuit?
As we're in open forum, lets say a silly price of £500 & £50 per circuit for the EICR, then £1000 for the CU change (normal 3 bed domestic property, dual RCD CU).
I just used just charge the £1000. However, I'd carry out some suitable testing, the day or so before.
