It doesn't incorporate overcurrent protection.
That is one of a few!It doesn't incorporate overcurrent protection.
You got it, they cut the pin off and notched the rcd, put it top of the board to allow it in at the back, 100% for inginuity but not the way to do it lol.How does it get a neutral?
I would imagine the person responsible for the installation of the Fusebox MCB is also responsible for tampering with the bus bar and the link cable!
To add insult to injury the tie tails have all been roughly cut off leaving sharp edges everywhere.Any MI installation that use plastic cable ties is likely to be a rough job in more ways than one
And that installation is dog rough