I
ICE
Hi,
Any suggestions please:
State what, in addition to compliance with BS7671:2008 , the designer must ensure when carrying out an alteration or addition to an existing installation. Assume the earthing and load capacity meet the requirements...
ALSO:
List the 1st 3 live tests to be undertaken on a new installation which forms part of a TT installation...
Any suggestions please:
State what, in addition to compliance with BS7671:2008 , the designer must ensure when carrying out an alteration or addition to an existing installation. Assume the earthing and load capacity meet the requirements...
ALSO:
List the 1st 3 live tests to be undertaken on a new installation which forms part of a TT installation...