Inspection& Testing , before an Installation is Fully Commissioned is a Critical Task. :53:
“ Visual &Testing “
:juggle2:
Apprentices & 2392-10 . Ring Final Circuit .
This is just the same as if you where doing it onConsumer Unit ( DEADTEST )
On Industrial Premises’ .
When doing Insulation Resistance Testing on a Ring Final Circuit it have to “ Be “ Individually . ( IR ) as it is NOT Possible to carry out InsulationResistance on Industrial Installation as a Hole ’ . Yeah
Firstly . Ring Final Continuity Checks .
This is done by disconnection of Both Ends of the Line ( Neutral &Circuit Protective Conductor ) from the Board.
Continuitycan be Checked for Each Conductor .
Check : Null out yourLeads / Megger 1552 .
Step - 1. Line to Line . 0.26Ω . ( Lower )
Step - 2 . Neutralto Neutral . 0.26Ω . ( Lower )
Step – 3 . CPC to CPC . is aReduced Cross-Sectional Area its Résistance . ( Which then is “ Higher “than the Phases0.33Ω .) being/ Line / Neutral
Next Step .
( DB ) “ Distribution Board “Cross/ Connect . Neutral to Line. Vice. Versa
( DB ) “ Distribution Board “Cross/ Connect . Line toNeutral
The Résistance of the ( Line& Neutral Résistance at any SocketOutlet ) Readingshould be the Same . ? 0.15Ω
• IndustrialInstallation / Wired in Single(s) Core Cables “ Same Size “ ???
• If Readings ( Increase ) from point of supply . You may have ( Mixed ) up the Line& Neutral Conductors . off the Two Legs of the Ring .
Double Check (- The Readings should be ??
Line :0.26Ω
Neutral: 0.26Ω + ( 0.26Ω + 0.26Ω = Combined 0.52Ω )
¼ Combined : 0.13Ω
“ Spurs “ will give a SlightlyHigher Reading(s) it will give the Résistance of the Spur Conductors’ .
Next Step . ( Final )
( DB ) “ Distribution Board “Cross/ Connect . Lineto CPC . Vice. Versa … Readings / ( R1 + R2 )
( DB ) “ Distribution Board “Cross/ Connect . CPCto Line .
The Résistance of the ( Line& CPC Résistance at any Socket Outlet ) Readings / ( R1 + R2 ) Polarity checked at this Stage . as well as Visual Inspection on Terminals .
The reading should be the Same ( ¼ Combined Résistance : ofthat of the Line &CPC .
Spurunits will be Slightly Higher .
The Highest Reading Obtained . will be Recorded . ( R1 + R2 ) Schedule of TestResults. ( Line / 0.22Ω + Neutral / 0.23Ω) R2 – CPC /0.3 . ( R1 + R2 ) 0.52Ω
Whilst the Ring Conductors are Disconnected it make sensethe do Insulation Résistance Test . at this Point .