if you`f got a supply to all points then energise....prove functional...that gets R1 out of the way....
dont worry..it`l be ok as theres a competant person on site (you).....

- - - Updated - - -

then kill it....and get your R2s....
 
Hello everyone - VERY ****ed off with myself. Started the day by testing neutral v cpc at rose #4. All of you know what's coming next. I have a 'system' when I first fix with the three cables at ceiling rose's. Inner Loop - cut the cable square. Outgoing Loop - strip an inch off the outer sheath leaving the conductors exposed. Switch wire - Nick the cable with a single vertical cut. Then, when I come to wire up the rose, I know which cable is which - especially which switch wire to sleeve brown. OF COURSE THIS ONLY WORKS IF YOU NOTCH THE CABLES CORRECTLY AT FIRST FIX, YOU MORON!..... So sorry to have wasted everybody's time last night. KK
 
Hello everyone - VERY ****ed off with myself. Started the day by testing neutral v cpc at rose #4. All of you know what's coming next. I have a 'system' when I first fix with the three cables at ceiling rose's. Inner Loop - cut the cable square. Outgoing Loop - strip an inch off the outer sheath leaving the conductors exposed. Switch wire - Nick the cable with a single vertical cut. Then, when I come to wire up the rose, I know which cable is which - especially which switch wire to sleeve brown. OF COURSE THIS ONLY WORKS IF YOU NOTCH THE CABLES CORRECTLY AT FIRST FIX, YOU MORON!..... So sorry to have wasted everybody's time last night. KK

Good man for your honesty. We all learn the hard way and you had the bxlls to tell us about your mistake!
 

OFFICIAL SPONSORS

Back
Top