- Reaction score
- 6,440
Ze irrelevant, it may be a TT system, remember I said 16Ka+ .You do the maths?
At what point did I say PEFC?
Discuss main cut out fuse in the UK Electrical Forum area at ElectriciansForums.net
Ze irrelevant, it may be a TT system, remember I said 16Ka+ .You do the maths?
If it wasn't dangerous why should DNO engineer's wear IR gloves, gauntlets, full face protection and flame retardant clothing.
the point i`m making is pullin a bastid fuse has gone epic....If it wasn't dangerous why should DNO engineer's wear IR gloves, gauntlets, full face protection and flame retardant clothing.
the point i`m making is pullin a bastid fuse has gone epic....
and i dont buy for one second that most in here havn`t done it because of `elf n safety`...so stop blaggin....
Come on, were talking about the incomer which is protected at the supply transformer by what? 200A 250A 300A etc,different ball game.
Reply to main cut out fuse in the UK Electrical Forum area at ElectriciansForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.