N
Nicebloke
I am applying for the NEICE Domestic Installer scheme. I was an NiCEiC DI about 10 years ago and all they required was 2 pieces of work to see. Their website says that want to see the paperwork/evidence for all your electrical work over the past 12 months. I have been working for someone else so I can't produce the evidence/paperwork on that, and even if I had been working for myself I shouldn't have been doing notifiable electrical work over the past 12 months if I wasn't part P registered.
It also says that access to the sites must be within 30 minutes of each other (same as before). Do they still require 2 sites to see your work, or is one larger installation sufficient?
It also says that access to the sites must be within 30 minutes of each other (same as before). Do they still require 2 sites to see your work, or is one larger installation sufficient?