Hi,

We're re-wiring a flat that currently has a split load board with an off peak section for some convector heaters and 2 storage heaters. The off peak has its own meter that is radio controlled. We need to rewire the board and put the off peak into a separate board via a henley block, just wondered if this was just a case of taking the off peak supply into the new board and wire the rest as per usual, just wasn't sure how the meter situation worked?

Thanks

Ben
 
obviously the metering company would come out and make safe before they move the tails over to your new DB's.

gotta be careful with radio and timer meters.

could be working on something that's dead, next minute you know the timer kicks in and turns on the power to you unsuspectingly working on the circuit !
 