newfutile

-
Arms
Supporter
One of our contractors has identified a concern with multiple showers on a single 100 amp supply.(unsure how many yet i have asked for further infomation)
They have asked our company for a solution (which means me!).
Other than getting a 3 phase supply in the only other way is a shower priority unit?
Has anyone installed one of these? I was looking at the Garo units ,some are listed as priority and non priority does this mean one is a master and the others are locked out? And does a non priority one mean first come first served?
 
Other than plumbing solutions, e.g. if there is combi boiler available possibly remove one of them, then yes it's work out your own max demand figure, and if you are concerned it's either bigger supply or a Garo unit.
I've used one in a Victorian town house where the 3rd floor flat wanted an electric shower and the cable run was horrendous (even by my pragmatic ambitious standards).
When I saw the flat was tiny and had a cooker circuit, I reasoned that one person is reasonably unlikely to be cooking and showering at the same time, and fitted a Garo non-priority unit. It's worked well.
 
One of our contractors has identified a concern with multiple showers on a single 100 amp supply.(unsure how many yet i have asked for further infomation)
They have asked our company for a solution (which means me!).
Other than getting a 3 phase supply in the only other way is a shower priority unit?
Has anyone installed one of these? I was looking at the Garo units ,some are listed as priority and non priority does this mean one is a master and the others are locked out? And does a non priority one mean first come first served?
Yep, you are correct. We have fitted them in the past.

As an aside we did an EICR in a house once with 3 electric showers. All were kW or above and they'd never had an issue!
 
Used loads of them, but usually the Hager units. (Although these aren't in a steel enclosure as they are not designed for the UK market.) Any of the units I have seen will have a 40A protective device, so in standard electric shower ratings above about 8.5kW showers you may struggle to find an off-the-shelf solution.
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

newfutile

Arms
Supporter
-
Joined
Location
hemel hempstead
If you're a qualified, trainee, or retired electrician - Which country is it that your work will be / is / was aimed at?
United Kingdom
What type of forum member are you?
Electrical Engineer (Qualified)

Thread Information

Title
Shower priority units
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
3
Unsolved
--

Advert

Thread statistics

Created
newfutile,
Last reply from
Risteard,
Replies
3
Views
708

Advert

Back
Top