A few years ago I was conducting a PIR inspection in a small joinery premises. There were two DBs in the building one being on all the time and fed the office small power,all lighting and alarms etc.
The other DB fed the machinery in the joinery workshop,this DB was supplied via a 3 phase RCD.
Heres the good bit, the emergency stop buttons in the workshop were wired so when one of them was
hit it created an N to earth short and thus tripped the RCD supplying the machine DB.
Apparently it had been like that for years.