F
fali786
Re: Tell us about your faults !
The terminals are not large enough for a 16mm cable.
The terminals are not large enough for a 16mm cable.
I've seen that before in a commercial environment, except that the different ends of the ring had been wired into the same phase on two different DBs! In different parts of the building! Came as quite a shock when the electrician turned off the main breaker on one of the boards and discovered that one of the phases was still live with no apparent source...Both the upstairs and downstairs rings had been wired into 2 different 32A MCB's.



I've probably mentioned my "classic example" of something similar on here before. In case you haven't heard it; working on a village shop which had two 6/8 way Wylex c/units. One of the circuits (ways) in unit A was fed into one of the circuits (ways) of unit B. My mind still boggles at the dangerous situations that that scenario would create. Switching off unit A would mean unit B would still supply it thro' a fuse-way onto the bus-bar........and vice versa.I've seen that before in a commercial environment, except that the different ends of the ring had been wired into the same phase on two different DBs! In different parts of the building! Came as quite a shock when the electrician turned off the main breaker on one of the boards and discovered that one of the phases was still live with no apparent source...
![]()
Spot the fault if you can on this bathroom vanity mirror light...
A hint is that the customer says the lamp blows instantly when the switch is pressed..."but it has been working fine"