Or just ring the DNO...
thse people do the seals and tool and they're cheapI'm in Devon Phil, I'll re-seal. That's good advice. Thanks mate
I'm in Paignton... that's ideal for me. I'll do it that way... forget my original post.thse people do the seals and tool and they're cheap
"Universal electric meter services", Products you can trust at great prices
Hi, could someone advise me of the safest procedure when pulling live meter tails from the isolator switch at the consumer unit. I know about switching off the main switch to take out the load, but will not be cutting the seal and pulling the fuse from the cut-out. On this occasion I need to pull out the live first... connect to a Henley block and then the neutral and do the same. When reconnecting I will connect the neutral first and then the live. I was wondering if anybody could offer any helpful advise that I may have overlooked.
Regards Paul
Ok, no problem. ThanksYep don't do it, it's dangerous, get the DNO to fit an isolator after the meter cost to client about £50:00
Hi Stan, thanks for the advice, but I need to on this occasion.
Regards Paul
Yep don't do it, it's dangerous, get the DNO to fit an isolator after the meter cost to client about £50:00

Ok, I get the message. ThanksSo you should be fully aware of safe isolation, no excuses. How would your family amd friends feel if itvwent wrong and you met your maker just because you csnt be bothered to do something properly?
Hi, so cutting and re-sealing is the way forward as it's an urgent joba week !!??
forget that , i can get the seal cutting fairy on site in 5mins !
;-)