S
switched on
hi i have now completed my college course my city ang guilds 2330 level 3 but just need to do my nvq3. Some close friends are doing a job through building regs its a rewire plus a big extension. i have heard that i am competent to do the work and then get building control to sign it off. Has anyone done it this way? Usually i get my friend to sign it off as he is napit registered but they don't want to do it that way. What will building control want to see 1st fix then second or just a final test etc? A bit more info would be brilliant thanks for your help in advance