T
TPES
I Quoted for a job.... It involved.. 1st + 2nd fix
Kitchen/diner Rewire, All new circuits, New RFC, New Cooker Circuit, Spurs for low level sockets. Dedicated heating radial for boiler. Kitchen extractor, Downlights in kitchen.
Mains CU change from old 3036 to dual RCD 17th board. Bond both gas and water.
Also wire up to bathroom in 10mm T&E For shower, New isolator.
ALL materials/Cable supplied. (Except for the downlight fittings, Thats only thing customer would have to choose/buy.)
Full Inspect, Test and certificate issued..
What would you have estimated for this...
They just emailed me saying.. "Thanks for the high quote...lol"
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
I've just answered my own question... Yes i am too expensive, Otherwise i'd of got the job!!
Just wondering how i compared to you guys, Ill let you know when i got some replys what price i put in.
Kitchen/diner Rewire, All new circuits, New RFC, New Cooker Circuit, Spurs for low level sockets. Dedicated heating radial for boiler. Kitchen extractor, Downlights in kitchen.
Mains CU change from old 3036 to dual RCD 17th board. Bond both gas and water.
Also wire up to bathroom in 10mm T&E For shower, New isolator.
ALL materials/Cable supplied. (Except for the downlight fittings, Thats only thing customer would have to choose/buy.)
Full Inspect, Test and certificate issued..
What would you have estimated for this...
They just emailed me saying.. "Thanks for the high quote...lol"
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
I've just answered my own question... Yes i am too expensive, Otherwise i'd of got the job!!
Just wondering how i compared to you guys, Ill let you know when i got some replys what price i put in.
Last edited by a moderator: