I had a simular fault a few weeks ago in a rented house. There was a leg between two sockets that had a fault. The leg in question runs under a concrete floor, so no way of getting to it without smashing the floor. I would of just replaced the leg but I found that one of the legs, from cu was in 1.5mm. Luckily, this went to one of the sockets that the dodgy leg was on, so I just didnt connect that leg back up. Tenant was happy because he never used that socket anyway. So he ended up a radial and one less socket. I told the landlord that I needed to add a new leg from cu to first socket (to replace the 1.5mm), then a new leg from there, to the next socket (to replace faulty leg), this would give him his ring back...but he didnt want the expense, or the mess!! Cheap skate!!
Bet I get called back to do it over winter though..lol
Bet I get called back to do it over winter though..lol