S
Splext
Hi Guys, sorry is this has already been asked or if its in the wrong place. Have only just joined today 
I recently completed my quals and am looking to register with NIC so I can notify and certify my own work.
I am planning on them assessing me on a board change I am doing at my mums (which will be my first job).
I got told by my instructor before I finished the course, that I should contact Building Control telling them I will be doing the work, and they should just say; OK, and leave it to the NIC to sort out through my assessment.
When I contacted Building control, they are asking for £200 to have someone 'watch me do the change, and then certify my work, so they can send the certificate out'.
Is that how it has to be done? I was under the impression that because the NIC are coming to check it for my assessment, I can write out the Cert's and they will then notify through them and I only have to pay one sign up fee to NIC and nothing to Building Control.
I just loathe to pay more than I have to, seeing as this is my first Job (costs covered only) and I haven't had any income for a while now.
Hope this makes sense to anyone, and hope someone can help me.
Thanks in Advance
Marc

I recently completed my quals and am looking to register with NIC so I can notify and certify my own work.
I am planning on them assessing me on a board change I am doing at my mums (which will be my first job).
I got told by my instructor before I finished the course, that I should contact Building Control telling them I will be doing the work, and they should just say; OK, and leave it to the NIC to sort out through my assessment.
When I contacted Building control, they are asking for £200 to have someone 'watch me do the change, and then certify my work, so they can send the certificate out'.
Is that how it has to be done? I was under the impression that because the NIC are coming to check it for my assessment, I can write out the Cert's and they will then notify through them and I only have to pay one sign up fee to NIC and nothing to Building Control.
I just loathe to pay more than I have to, seeing as this is my first Job (costs covered only) and I haven't had any income for a while now.
Hope this makes sense to anyone, and hope someone can help me.
Thanks in Advance
Marc