- Reaction score
- 1
it was a long time ago and yes while being assessed working for someone else and i had the unlucky visit with the company manager aswell so never really looked into it.I think it strictly means selling PME to another country, which is utter nonsense.
It is a phrase used incorrectly, usually by people who get their knowledge from rumours and what their mates tell them in the pub, to refer to extending the equipotential zone of a PME installation to outbuildings.
[automerge]1578169573[/automerge]
A governing body tapped you on the shoulder???
Do you mean the assessor from a competent person scheme talked to you about this and you believed everything they told you without checking the facts and theory for yourself?
[automerge]1578170015[/automerge]
20a mcb at board db1 measured at db2 rewirable fuse metal clad boardWhat's the swa supplied from? Ze is only measured at origin of installation, you're presumably taking about the zs of a distribution circuit.