Im getting sick of working for other people, so ive decided that im gona register with a scam, and then see if i can get enough work to jack in agency stuff.
For my assesment, i intend to split tails at main head, switchfuse or 4way board with isolator and 32Amcb supplying 6mm2 swa to garage. in garage 6way board for power, lighting, future garden lighting and 110v tranny spurred off power. sockets all RCD sockets, apart from one which i want for testing RCDs ect. everything in PVC tube.
house is TNC-s
as per the title, the garage is attached, but do the requiremnts still apply for outbuildings? there is not internal access to garage from house. also ive ive got one bit of maybe extraneous (not tested yet) metalwork in the garage, but it is a tiny bit of copper pipe supplying a tap, and its half buried in a wall.
if the garage is classed as an outbuilding, then according to the brb i have to run 10mmg/y to the garage. the thing is, the house CU is only 6m away, and IMO the ground potential will be no different across that distance. i wil, run 10mm if need be, but whats your opinions on this? is a copper pipe in an outbuildiding a few m away any different to one that is 20m away in a larger house?
thanks
John
Im getting sick of working for other people, so ive decided that im gona register with a scam, and then see if i can get enough work to jack in agency stuff.
For my assesment, i intend to split tails at main head, switchfuse or 4way board with isolator and 32Amcb supplying 6mm2 swa to garage. in garage 6way board for power, lighting, future garden lighting and 110v tranny spurred off power. sockets all RCD sockets, apart from one which i want for testing RCDs ect. everything in PVC tube.
house is TNC-s
as per the title, the garage is attached, but do the requiremnts still apply for outbuildings? there is not internal access to garage from house. also ive ive got one bit of maybe extraneous (not tested yet) metalwork in the garage, but it is a tiny bit of copper pipe supplying a tap, and its half buried in a wall.
if the garage is classed as an outbuilding, then according to the brb i have to run 10mmg/y to the garage. the thing is, the house CU is only 6m away, and IMO the ground potential will be no different across that distance. i wil, run 10mm if need be, but whats your opinions on this? is a copper pipe in an outbuildiding a few m away any different to one that is 20m away in a larger house?
thanks