uksparks
-
- Reaction score
- 1,228
I usually say a £50 pre work survey is done first to identify any issues, then this comes off the bill at the end. I normally do this during the week before the board change. its 'unlikely' that anything will break or cause problems in-between doing that and changing it, admittedly I do global IR's just as a good measure just before I rip it off the wall.