you need to show on drawing for question C , switched socket outlets for a kettle, TV phone charger / laptop in each room (use OSG to put minimum number of socket outlets per room depending on size, you also need to show FCU for 700W heating/cooling and FCU for bathroom towell rail.
For question D show position of DB in each room and each of the above circuits coming from this db
label each circuit (for question e) i.e R1R for room 1 ring R1H for room 1 heating R1 TR for room 1 towel rail, the R2R for roomn2 and so on.
include a legend showing symbols used
 
Upvote 0
Why 8 CUs?
It states it
you need to show on drawing for question C , switched socket outlets for a kettle, TV phone charger / laptop in each room (use OSG to put minimum number of socket outlets per room depending on size, you also need to show FCU for 700W heating/cooling and FCU for bathroom towell rail.
For question D show position of DB in each room and each of the above circuits coming from this db
label each circuit (for question e) i.e R1R for room 1 ring R1H for room 1 heating R1 TR for room 1 towel rail, the R2R for roomn2 and so on.
include a legend showing symbols used
Cheers mate , appreciated.
 
Upvote 0
Why 8 CUs?
D Show, on either electronic or hard copies of the drawing, how each circuit in the new hotel
extension is to be arranged. The arrangement must take into account that a fault in any one
room must not effect another room.
becouse it is one way of achieving the question. There are other ways of achieving this.
 
Upvote 0
the assignme
What do you mean? where does it state that each room should have its own CU?
the assignment spec says "
"d) Show, on either electronic or hard copies of the drawing, how each circuit in the new hotel
extension is to be arranged. The arrangement must take into account that a fault in any one
room must not effect another room." ONE way to achieve this is to have a seperate DB in each room. but it could also be achieved in other ways.
The spec also states
"
c) Show, on either electronic or hard copies of the drawing, positions of socket‐outlets and
fused connection units for the new hotel block giving consideration to the following items of
equipment in each room
 kettle
 TV
 provision for phone charging and/or laptop use
 supply to a 700 W air handling unit for heating/cooling (installed by specialist)
 electric towel rail.
NO NEED TO SHOW LIGHTING IN HOTEL EXTENSION
 
Upvote 0
Best EV Chargers by Electrical2Go! The official electric vehicle charger supplier.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

Joined
Location
essex
If you're a qualified, trainee, or retired electrician - Which country is it that your work will be / is / was aimed at?
United Kingdom
What type of forum member are you?
Trainee Electrician

Thread Information

Title
Help regarding 2365/5357
Prefix
N/A
Forum
Electrician Courses : Electrical Quals
Start date
Last reply date
Replies
21
Unsolved
--

Thread Tags

Advert

Thread statistics

Created
crees89,
Last reply from
ahmed1963,
Replies
21
Views
26,350

Advert

Electrical Courses

This is the main Electrical Courses at ElectriciansForums.net. Find local recommended electricians courses. Avoid training "company" scams. Always go view the training centre before booking any electrical courses.
Back
Top