B
blackiel
Sharing circuits is asking for Grief later on,put them on their own cct,no call backs...
Just wired a HMO myself and standard interlinked smokes were unacceptable to the council and fire officer.
Full risk assesment was required and ended up putting in a level 1 grade a system to keep all parties happy!
3 Storey student house with 6 double bedrooms which makes a significant difference.
on a side not are you required to over sleeve the interlink cable? i dont see why you would tbh.
think you may of missed my point mate.I didn't sleeve, I used yellow single, labelled at each end.