Des 56 I think that comment is absolute nonsense. Need to get with the times and learn that everything moves on. But these thickos out there need to understand brown is permanent !!!!!!

Here is a but more nonsense Dearest Derrick
I have got with the times,although white still holds some affection
 
Might of missed something here, but if this is a single phase install then black does not exist!, wether its switched or not it's a line conductor and if sleeved brown then it's colour is brown
 
Might of missed something here, but if this is a single phase install then black does not exist!, wether its switched or not it's a line conductor and if sleeved brown then it's colour is brown

it does if you're using 3 core/E.
 
An argument we could have for a long time, black is a three phase line conductor, when u sleeve it brown it's brown, if the cores were insulated crimson and u sleeved them brown then they are now brown end of, my point is it doesn't matter what colour they were it matters they are the right colour now
 
I cant believe that this is such a debate point; as Lland' has pointed out if black is used in single phase then it is required to be sleeved (Brown in this case), this then gives you a personel choice of which to use as live and which as switch, there are no rules or regs telling you but common sense makes it easier to use natural brown as permanent live and sleeved brown as sw/live as but again il re-iterate it your own preference as they will be both brown after you have terminated and sleeved where necessary.
Next question! which is the front side and which is the backside of the sun?
 
Des 56 I think that comment is absolute nonsense. Need to get with the times and learn that everything moves on. But these thickos out there need to understand brown is permanent !!!!!!


You need to address your attitude sir or you wont last long here!!!!!

Using the black conductor as a permanent live conductor does not make anyone a thicko or a cowboy!

You best address all the manufacturers of plug-in ceiling roses with your concerns as ALL of them use the black conductor within the flex of a 4 pole rose as the permanent live conductor.
 
The point is dark wood when your work on major projects when many electricians are working it becomes a point. When switching is ran through contacts bringing on many circuits and lights.
 
Lenny don't tell me about my attitude please because nothing is out of line. And tbh Íve been sparkying for over 20 yrs now and I love my job and have a great passion for it and it really gets to me when people act thick and class black as permanent. Rant over !
 
Even this thicko carrot cruncher can work out the OP was asking people's opinion's to find out the system a majority use...as with many things there's no rules or regulations but some sort of continuity would be a good thing.
 
The point is dark wood when your work on major projects when many electricians are working it becomes a point. When switching is ran through contacts bringing on many circuits and lights.

If working on major projects, it would be prudent to check with your Charge Hand/Foreman/Site Manager, and likewise they should check with you. Sadly these kind of 'mishaps' are happening more and more as companies are making "aggressive commercial decisions" (please don't get me started). Ultimately the materials cost the same, I'll let you guess where the 'fat gets cut'. I have to agree with a few on here and say there is no set way of wiring, let alone which colours are utilised.
 
To me and it may sound silly, but a bit of brown sleaving on a conductor means switched live..so brown permanent etc ect.....
 
Cheers guys for all inputs had a lot of good points Lenny know your point with gregs think that is where the argument starts for us too. No clear cut answer.
 
Brown perm L for me and then black (sleeved brown ) would be the switched live

Still finding other sparks sleeving the black with blue to make it a neutral then sleeving grey with Green and Yellow in swa and for some reason drives me mad :)
 
The point is dark wood when your work on major projects when many electricians are working it becomes a point. When switching is ran through contacts bringing on many circuits and lights.
I see where your coming from but this isnt about which is which but a breakdown in comunication, your chargehand, foreman or boss depending who sits the highest when making onsite decisions should make it clear to all from the start, if this is a re-occuring argument then someone isn't doing there job properly by seeing the issue and holding a site meeting or even doing a one to one chat with all on site.
 
Lenny don't tell me about my attitude please because nothing is out of line.

Yes there is.................your attitude!!!

We try and keep this place as friendly and welcoming as possible for everyone to use, with a first post calling people cowboys & thickos because they do something in a way that you dont agree with is ignorance personified.

Is it dangerous..........no, is it against regulations............no, is it simply a matter of personal choice...........YES!!!
 