Just checked the NIC book on periodic inspections and their three star inspection service states '30% inspection, testing and additional items' additional items include earth continuity of all accessable exposed-extraneous conductive parts, PAT testing, fixed equipment, load measurement, terminal temperatures and produce a circuit chart. Without the additionals only 20% is required. However, as you are aware if you find non compliances these percentages need to be increased.

In my opinion stick to 100% that way the only comebacks are reworks
whats PAT testing got to do with the fixed wiring/install?
 
I was called to a house that just had a PIR done and found 4 faulty single sockets the tenant reported this to the "inspector" and when I contacted the letting agent I was told only 10% of the sockets were tested. So I said well 2 in the livingroom were u/s and the one in the childs bedroom had a neutral missing and the last one was right next to the DB ????? Mind its not that bad I got the job to change them plus I sent the Zs test results for all of the flats sockets and when they said that must have taken time I said no actually 15 minutes tops
well its your dead tests that drink up the time old...lol...
 
Nothing really but i suppose customers may expect them to be included although the NIC state 'these will be listed seperately'
customers will only expect em to be included if your foolish enough to tell em it is.....so you dont...if they have owt that needs pat testing...it should be on top....when you go into a property on a PIR you dont need to be distracted by old Mrs Biddle`s ropey iron..or kettle or whatever...PIRs are for FIXED WIRING/INSTALLATION and thats it....
 
Just noticed that eventhough its says overall 30% testing it does highlight that all accessable socket outlets must be tested for polarity and Zs
 
customers will only expect em to be included if your foolish enough to tell em it is.....so you dont...if they have owt that needs pat testing...it should be on top....when you go into a property on a PIR you dont need to be distracted by old Mrs Biddle`s ropey iron..or kettle or whatever...PIRs are for FIXED WIRING/INSTALLATION and thats it....

Just add an exception to the extent of the report. The usual, the report doesn't cover fire detection, intruder alarms etc...
 
Just add an exception to the extent of the report. The usual, the report doesn't cover fire detection, intruder alarms etc...
so on a PIR...would you not be testing the circuit feedins smoke/heat alarms?...look i`l tell you something vito.....we often find the CPC being used as the link wire on mains fed linked smokes/heats....so would you code that?...and if so what code would you give it....come on, this is PIRs....
 
so on a PIR...would you not be testing the circuit feedins smoke/heat alarms?...look i`l tell you something vito.....we often find the CPC being used as the link wire on mains fed linked smokes/heats....so would you code that?...and if so what code would you give it....come on, this is PIRs....

Sorry, it goes without saying all of the electrical circuits where accessable. i was referring to functionality and fire alarms.
 
Vito you rambling on about crap mate!

nobody has mentions Fire Detection or Security! and as usual the believers and non believers will be in disagreement with the NIC and its ramblings as well..!!

Part P operators need not poke there golden noses in the land of Inspections...!!
 
Sorry, it goes without saying all of the electrical circuits where accessable. i was referring to functionality and fire alarms.
even so....my question still stands vito...code or not....if code then what number?...
 
i know what i would code it!! and it would be followed by the big screw driver and GY Sleeving and loss of interconnection of units!
 
Vito you rambling on about crap mate!

nobody has mentions Fire Detection or Security! and as usual the believers and non believers will be in disagreement with the NIC and its ramblings as well..!!

How Rude,

I was merely stating word for word what they say. We all have our own way of doing things as i mentioned previously before we went off an a tangent. Mine is test 100% and on average sample 2-3 items per circuit (domestic) unless there are findings. Other than that i was just trying to make conversation on their reasoning. Seems like its time for bed
 