8kw pv installed two years ago 2phase jobs (2 x 4kw systems) The customer is now saying his electric bill has increase 100% . Its about 17000kw over this time and this is about what the pv has made. The house meter has 2.5mm cables going to it and its CT digital 3ph meter.
Could the PV make the meter run forwards or is it a faulty meter. SSE want £315 to look at the job?
thanks