£3.50 a fitting £1 a jnction box and a 35p a mter of cable, bulb £1 each talking £60 for materials max so £240 for a days work sounds good to me but it probably take me two days. and still sounds good
Do you think its a good idea to discuss such costings in the open forum? Maybe best in the Arms.
only have to be fire rated if theres insulation above, most say long as 100mm clearance all angles, £3.50 normal robus foittings is good to go? maybe im wrong hightower, but manufactures instructions over rules all
why 2 days for some downlights?....plot your joists (to avoid em)..cable, rods..etc....2 days????£3.50 a fitting £1 a jnction box and a 35p a mter of cable, bulb £1 each talking £60 for materials max so £240 for a days work sounds good to me but it probably take me two days. and still sounds good
Why didn`t you go on the apprentice framework from day one?...I am on level 2 year 2 so have the NVQ this year......but the point i was trying to get across was 2 days for some downlights seems a bit exessive.....what do you think?you want an apprentice next year glen spark when ive level 3 done before telectrix snaps me up like a sausage roll![]()
so how did the cable pass the joists, you squeeze the betwwen floor and joist or what?????
Ripples in the ceiling....lol..........:jester:How do you think?
Holes of course and the other was a dropped ceiling so happy days
blend the artex in with polyfiller.