Search the forum,

Discuss Testing Prior to scheme Inspection in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

T

TPES

I have my 2 jobs ready for my assessment & my assessment date, Obviously these 2 jobs need to be tested before put back in service and of course to show the Elecsa assessor. But where do i get the certs from to fill in?

I have downloaded the EIC & MWC from Elecsa's website and printed them out, tested and filled in these printed out certs, Are these going to be acceptable to show the inspector? is there something more i need to do or have to record results some other way.

Then hopefully as soon as he passes me i can notify both jobs and send into elecsa. is this correct?
 
Relax Sid, all sounds good!

What you`ve done is precisely what would have been suggested. Your thinking is sound.

Miind you, those seconds are ticking away as you read this...

countdown is progressing :D
 

Reply to Testing Prior to scheme Inspection in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top