Came out of the March 2012 exam liteally 30 minutes ago, anyone done it? How did you find it?
Discuss 2391 March Completed in the Electrician Courses : Electrical Quals area at ElectriciansForums.net
I wrote
Only worth 1 point each but you'll only get the points for:
Cpc - a circuit within the installation An exposed conductive part
Main protective bond - extranious conductive part within the install i.e water or gas pipe
Earthing conductor - consumer unit the means of earthing
I tested the lighting circuit in two parts. Up to contacted and the from bottom of contactor to lights. IMO you would be doing well to hold contactor in and take readings logistically.
I answered the same - disconnect contactor and time switch and link out.Yeah I put link out contactor and time switch
Yeah it didn't state where the contactor and time switch were, while it said the DB was next to the supply intake.IMO you would be doing well to hold contactor in and take readings logistically.
Legend of a man!
Thanks very much
Out of curiousity how did you grt hold of it?
id look at question 16 again with regard to the supply= need a live supply not to isolate
You would isolate the consumer unit at the main switch and test between line in and earthing conductor disconnected
You do not want power present when carrying out a Ze, as for Ze you have to remove the earthing conductor from the bar, so in theory people could be in the building using equipment that has no means of earthing if you left the board live like you insinuated