Personally I'd treat it as a CU change from the testing point of view.



No, only the ones where I disconnect every circuit for the installation, extend the cables, then make new connections. It just wouldn't seem right not to.

and all your customers are happy to pay for this extra service ?
 
and all your customers are happy to pay for this extra service ?

I doubt it, and I see your point Biff buddy, but if you disconnect a Dist board and extend the cables then re-connect I think it would be difficult not to re-test the circuits and certify, I have been racking my brains about not doing this, I can't see how it is avoidable, great debate though and interesting.
 
no-one is saying dont test or dont check over installation prior to any work , it was a question of which cert.
instead we get the usual drama queen crap on what if someone dies ?
i'm sure loads get killed every year from excessive R1+R2 readings.
 
no-one is saying dont test or dont check over installation prior to any work , it was a question of which cert.
instead we get the usual drama queen crap on what if someone dies ?
i'm sure loads get killed every year from excessive R1+R2 readings.

So what would you do "cowboy" lol
 
no-one is saying dont test or dont check over installation prior to any work , it was a question of which cert.
instead we get the usual drama queen crap on what if someone dies ?
i'm sure loads get killed every year from excessive R1+R2 readings.

I personally would issue a completion certificate due to the fact I had interfered with all circuits and would want to ensure they were safe and sound after re-connecting, plus it is my name of the certificate saying it is safe for a family to live in the house after the works.
 
I wouldn't be testing in case someone dies, just to make sure everything was as it should be. The other reason for testing the full range would be to cover myself if other subsequent work generated a fault. I would have a dated record of the readings at the end of the work I'd completed.

and all your customers are happy to pay for this extra service ?

What extra service? I'd only test the circuits I'd worked on, which is all of them, and issue the appropriate paperwork, which would be an EIC.
 

Reply to Moving the CU in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top