westward10

Staff member
Admin
Esteemed
Supporter
It is often said on here we criticise others work without having the conviction to show our own work. We have Dodgy Trade Pics For Your Enjoyment so let's show the other side. No job too small or to big, before or after let's see 'em. I can change the header if someone can think of a better one. I shall start the ball rolling with this considerable board change I did today:)
20190718_142938.jpg
 
No bolting, my Hilmor is an older model that has a bit more meat on it though. It takes all my strength to bend 32mm, especially as I'm only little. I do have a hydraulic bender for 1 1/5" and 2" conduit though. 4 bends in each length here.
View attachment 53379
What sin is the tape covering?

Top bending though, I'd have gone through a mule of pipe just to do one of those, badly.
 
So here was today’s task getting a Schneider MCCB Panel unloaded and built up. The panel came in 3 sections with all MCCB’s installed. The largest section being 2M high, 1.95M wide and weighing 640Kg.
68E02684-2F40-4B4F-9506-5849AAD50B8C.jpeg

It had to be turned on it’s side to squeeze it in.
DDF0B708-9788-4A96-BD3A-3B81FFB74362.jpeg

Not much room lol and then there was the stairs.
4EC34191-F189-44B4-B1A9-E65CA44C7C3E.jpeg

Old containment got in the way so that was chopped. All getting redone anyway so not a problem.
7A8B10E6-EEF7-4D67-9DEC-2649A5B12EB8.jpeg

Finally get onto the home straight. Just to get into room and joined together.
CCD1ED6F-5B12-4C89-ABED-D180644270E9.jpeg
AB0E887D-5271-413E-BF1A-8842313BD19C.jpeg

Drum roll please....the finished panel set in place and bolted together.
2F68F1C1-808D-4B67-9FFE-549483D1C6C0.jpeg
805304BF-27B5-4751-89AE-7ADEC2714FFF.jpeg

Next task is to get the 240mm AWA singles into it.
 
Nice job, shame about the manky old pyro shroud though [A reused supply cable from the original DB ?]
Yeah it was reused, but being that is was a school, they did not really have the available cash to replace the submain, but it tested out fine, over 1000Megs, the length of the run back to the incomer was about 30-35m. Not far really, but a a right pain of a route, so we stuck with it, the painters gave it a lick of white paint and it looked ok,
 
Yeah it was reused, but being that is was a school, they did not really have the available cash to replace the submain, but it tested out fine, over 1000Megs, the length of the run back to the incomer was about 30-35m. Not far really, but a a right pain of a route, so we stuck with it, the painters gave it a lick of white paint and it looked ok,

If it is in good condition and suitably sized why would you want to replace it?
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

westward10

Staff member
Admin
Esteemed
Supporter
Joined
Location
Northamptonshire
If you're a qualified, trainee, or retired electrician - Which country is it that your work will be / is / was aimed at?
United Kingdom
What type of forum member are you?
Electrical Engineer (Qualified)

Thread Information

Title
Trade pics for your enjoyment.
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
131
Unsolved
--

Advert

Thread statistics

Created
westward10,
Last reply from
ChrisElectrical88,
Replies
131
Views
19,865

Advert

Back
Top