looking for clarification on the status (notifiable/ not notifiable) of installing SPD's to existing installations C.U. or in a standalone enclosure.
many thanks
 
looking for clarification on the status (notifiable/ not notifiable) of installing SPD's to existing installations C.U. or in a standalone enclosure.
many thanks
In England, there are only 3 things that need notifying:
A new circuit
A replacement consumer unit.
Additions or alterations in a room containing a bath or a shower.
thank you loz I am aware of what you stated, just wondered if the addition of a SPD is classed as notifiable as your adding MCB protection for the SPD and reconfiguring the C.U.

For example If you change the size of protective device for an existing circuit this is deemed notifiable.

So there are other instances where certain jobs are notifiable that are not listed in Document Part P.
 
Last edited:
thank you loz I am aware of what you stated, just wondered if the addition of a SPD is classed as notifiable as your adding MCB protection for the SPD and reconfiguring the C.U.

For example If you change the size of protective device for an existing circuit this is deemed notifiable.

So there are other instances where certain jobs are notifiable that are not listed in Document Part P.

Might be worth speaking with your scheme provider to see what they say?

I’d be interested to here the outcome, even though I’ve not encountered this scenario as normally just do them as part of a board upgrade.
 
Might be worth speaking with your scheme provider to see what they say?

I’d be interested to here the outcome, even though I’ve not encountered this scenario as normally just do them as part of a board upgrade.
I'm currently not registered with my scheme provider as I have been off work for some time, returning back next month. just getting my head round the changes for bs7671 18th edition amendment 2
 
I'm currently not registered with my scheme provider as I have been off work for some time, returning back next month. just getting my head round the changes for bs7671 18th edition amendment 2

If I get time this week I’ll phone mine up and pose the question to them to see what they say.

I’m in agreement with what’s been posted above for the same reasons though. 👍
 
Best EV Chargers by Electrical2Go! The official electric vehicle charger supplier.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

Joined

Thread Information

Title
Installation of SPD's either in existing C.U. or standalone be a notifiable job..
Prefix
UK 
Forum
UK Electrical Forum
Start date
Last reply date
Replies
18
Unsolved
--

Advert

Thread statistics

Created
ianphilip007,
Last reply from
timhoward,
Replies
18
Views
3,778

Advert

Back
Top