R
RyanCheetham
Been to look at a CU upgrade today and the bonding has been done in 10mm but it is looped from Gas to Water (all one piece of cable with no cuts/joins) what i am asking is wether or not this is ok as it is or should i seperate them and run seperate bonding to each service? This is a setup i have not come across before