chloebear
Got a bit of a problem working this one out, maybe someone can help - I have to install 3x washers & 3x Dryers (single phase) in the same location. The only board I can take the feed off is in an adjacent building (15 / 20metres away) with enough spare ways on the current 3 phase board.
Problem is that the feed cables will need to be SWA underground between the buildings, each machine is rated at 4.8Kw even if I run 2x 10mm swa cables and split the machines 3 & 3 the maximum load on each cable if all 3 machines are running together will be in excess of 60A - over the size of the largest breaker available.
Any sugestions greatfully recieved.
Problem is that the feed cables will need to be SWA underground between the buildings, each machine is rated at 4.8Kw even if I run 2x 10mm swa cables and split the machines 3 & 3 the maximum load on each cable if all 3 machines are running together will be in excess of 60A - over the size of the largest breaker available.