Relocating a Consumer Unit

Discuss Relocating a Consumer Unit in the Electrical Wiring, Theories and Regulations area at ElectriciansForums.net

acvc

-
Reaction score
26
HI there.

I've been asked to move a consumer unit from above a floor to below a floor (in the basement, still accessible). It's a move of about 1.5m.

While I would like to upgrade this to an Amendment 3 compliant consumer unit (thereby requiring full testing), the customer is telling me that this is not necessary because another electrician quoting for the same job "has said so".

Do the Regs require it???

Many thanks.
 
You will be installing a new consumer unit, even if it was the one that you just removed (in my view). You will have to completely remove all circuits, disassemble the CU etc. To me it is a CU change. Notifiable and must be up to current regs, i.e. "amd 3 compliant". Others may disagree.
 
Are you in a scheme, ask them? If you moving said CU, and not replacing it, you could argue the case. For example, if you moved it a few inches up or down etc, don't think it would need replacing with A3 CU. Moving it to different room, dunno?
 
This is a good question this, agree with Midwest move it a bit either way who cares, move it to a different floor 1.5m away then it must be metalclad ?
Scheme providers may well say metalclad, maybe I would but the board is not being replaced. I would say there is good argument to reuse the old one.
 
If the description of works carried out that you write on the certificate says
"Changed consumer unit" New metal clad or a cupboardy thing to enclose the plastic item needs be
"Re positioned existing consumer unit" ,then plastic it shall be,that would be the extent of the works that is what gets done


Maybe we ought to take account of needless cost being inflicted on a householder and for what benefit
 
This is a good question this, agree with Midwest move it a bit either way who cares, move it to a different floor 1.5m away then it must be metalclad ?
Scheme providers may well say metalclad, maybe I would but the board is not being replaced. I would say there is good argument to reuse the old one.

So the scheme providers can write their own regs now!!!


With regard to the OP if the consumer unit has been installed for a few years with no fires then it is tried and tested as non combustible
 
So the scheme providers can write their own regs now!!!


With regard to the OP if the consumer unit has been installed for a few years with no fires then it is tried and tested as non combustible

A situation that essentially changes once it is totally removed and installed elsewhere, with everything re-terminated. That argument doesn't hold up, to me at least.
 
If you can undo the fixing screws to the CU with out taking the insides out and then stretch the cables enough to fix 1.5 metres away then all good, no testing needed ( Big laugh ). If you have to extend cables so you have to disconnect from original CU then unless old CU is less than a year old you have to change it or put it in a noncombustible box but will have to do all the testing and certification that comes with this type of job, my way of thinking is if the customer doesn't want me to do it my way which after my years of experience is probably the best way, then I will walk away, when I look at a job it is always through my eyes not what the customer thinks or the last electrician that priced for the work has said
 
If you can undo the fixing screws to the CU with out taking the insides out and then stretch the cables enough to fix 1.5 metres away then all good, no testing needed ( Big laugh ). If you have to extend cables so you have to disconnect from original CU then unless old CU is less than a year old you have to change it or put it in a noncombustible box but will have to do all the testing and certification that comes with this type of job, my way of thinking is if the customer doesn't want me to do it my way which after my years of experience is probably the best way, then I will walk away, when I look at a job it is always through my eyes not what the customer thinks or the last electrician that priced for the work has said

In this case, it's been moved onto a different floor in the house, can't see him cutting a hole in the floor big enough to fit it through! Where does the one year thing come from?
 
So the scheme providers can write their own regs now!!!


With regard to the OP if the consumer unit has been installed for a few years with no fires then it is tried and tested as non combustible
Don't give a monkeys what the scheme providers say never have done, my ask was it would be interesting their take.
This really falls into no mans land, it probably isn't even notifiable under Part P and does it warrant an EIC or several Minor Works.
 
Not an expert but certainly is a grey area with no definitive answer in the reg's.
If the basement room is to remain just a basement and not everyday accommodation the why not sell the idea to your client that as the cu will now be out of sight out of mind then it is prudent that you install the amd3 metal clad cu as additional safety precaution even though there is nothing definitive in the reg's. That gives you the ammunition for your offer which carries some extra cost verses the other quote of just relocate the existing.
Just a suggestion anyway
Martin
 
I tend to look at things from the dock before the judge most of the time and what they might be asking me. When that conversation is finished I act accordingly. So Mr. x you thought that the house burning down as you did not follow regs was a reasonable risk? Could you enlighten the court as to the particular abberation in your thinking that led you to this conclusion?
Reply err..... well they said on the forum. Yeah it was that wotsisname hes always banging on about things like that.
SO... you chose to listen to an avatar on the web instead of following recommendations from some of the greatest engineers and luminaries in the electrotechnical world who compile regs for you to follow?
Errr.. well yeh seemed like a good idea at the time. End of conversation.
Ok I am putting in a metal CU end of. Or I aint doing the work. If I intervene in an existing situation I am required to leave it no less safe than it was. By current regs a plastic box is not safe according to the firemen and regs so I leave it safer with a fireproof CU or fireproof cupboard.
 
The first bit was a joke as you would be lucky to be able to stretch cables that length, the year thing is about the third amendment which I think came in January 2016, okay got that bit wrong it's February now so should have said within the last 13 months
Sorry
 
Intresting thread.. if you are removing installing cables out of mcbs then that circuit must be tested to be safe to renergise, when filling in eic on consumer unit change only we put 'consumer unit change only' in extent, so why not do the same here and write 'consumer unit move only' in the extent. What is the old board out of intrest? If it was pre 16th id refuse to do it.
 

Reply to Relocating a Consumer Unit in the Electrical Wiring, Theories and Regulations area at ElectriciansForums.net

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top