Search the forum,

Discuss order of equipment? in the Australia area at ElectriciansForums.net

Reaction score
2
hi folks, i have a tt 3phase supply, on tails from meter i was going to terminate in a tpn switch disconnector then 100ma time delayed 3p rcd, then dis board is this ok? or as the switch disconnector is metal would i need to come from meter into rcd then into switch disconnector?:confused: mant thanks
 

Reply to order of equipment? in the Australia area at ElectriciansForums.net

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top