Currently reading:
G83 Notification form

Discuss G83 Notification form in the Solar PV Forum | Solar Panels Forum area at ElectriciansForums.net

S

Sparkydan

Hi all

Sorry if this has been covered already, i am filing out my first UK power network commissioning confirmation form and was hoping someone could help me.

In the SSEG rating amps, volts and power factor, are these the maximum values given for the inverter?

and also how would i find the maximum peak short circuit current? is this from the D/B from the AC side?

Thanks in advance.
 

Reply to G83 Notification form in the Solar PV Forum | Solar Panels Forum area at ElectriciansForums.net

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top