Seems there are a lot of practices within the PV industry that is taken directly from Germany, another is the rod procedure for earthing an array frame if the earthing system is TNC-S. Here in the UK there is no problem with our stable PME system and I personally can not see an advantage of fitting a rod when you have a much more stable earthing system available to you.
Is the German PME system less stable than ours? I didn't know that.
The grey area with PME/PV systems is a nightmare. I can see both sides of the argument but currently we are advised to install a seperate earth rod and it's what we've been doing until we get told otherwise.