wow!
i used to work in a factory, that had a small conveyor system that went "under ground" below floor plates for about 50 meters. the conveyors were powered by small .75kw motors fed via swa on tray work. The lighting for the conveyor was singles, in trunking up to through conduit to the bulk heads. now they installed the trunking in the bottom of the pit and every year for about 3-6 month the bottom 6'' including the trunking would be full of water.
Motor fails, isolate conveyor, put pit lights on so you could see kneel and stand in water while replacing the motor!!!