yes it is notifiable which i can do through my niceic membership weather i should is another question i have the qualifications and the membership of the club i also have a complete lack of ability and knowledge and have relied for most of my life on the supreme confidence of total ignorance...
you didn't do a 6 year apprenticeship since July 2015 when the 3rd amd came in and that was the relevance of the question i rarely get involved in domestic but are having to add accommodation to an industrial unit.
with bs7671 Amd 3 2015
is a henley block considered as switch gear and therefore enclosable in non ferous
I know it doesn't switch But an MCB wont cause an issue in the open position
i have never seen a melted Henly and its not the same plastic as the old CUs anyway
your thoughts ?
the first thing to say is that i took the job over and the supply was to come from a closer house
BUT that house has a 60A supply a hot tub and a 9.5Kw power shower and it is tenanted, the farm owner has an 80A supply to a barn 200m away. the DNO have quoted 105,000 to put in a new 100A supply...
hi guys new to this so sorry if revisiting old stuff.
I need to run a sub main 200M from the service head to a log cabin
Super eco all LED etc, so 40A 9Kw max demand
if i use the cable calculators i get 185mm cable
we all know power networks cover huge distance with 35mm cable on 100A supply...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.