Gavin A
~
- Jan 20, 2012
- 4,122
- 1,135
- 2,688
- If you're a qualified, trainee, or retired electrician - Which country is it that your work will be / is / was aimed at?
- United Kingdom
- What type of forum member are you?
- Other
- If other, please explain
- Solar installer for 15 years
- Business Name
- Leeds Solar
ok input 1 isn't working properly, given your max figure, my suspicion is they haven't set up the dual tracker / parrallel tracking system correctly as IIRC 2.4kW is the peak output from one side by itself.
but I'm a bit confused by the voltage reading on Vin1
it will be simple enough to fix probably, unless there's another issue with string 1 developed as well
but I'm a bit confused by the voltage reading on Vin1
it will be simple enough to fix probably, unless there's another issue with string 1 developed as well