Evening
just looked at a job where customer wants a swa supply down to shed
but also wants swa cat6 down there to (going to be his home office)
The run is 30m and will be cleated- and only burried for 1m to cross a gate way
The run is to and from same place...
Cleating them side by side ok as there swa or would I need to space them?
cheers guys