the apprentice is sitting his am2 and question is on his 3 phase motor which is 5.5kw what is the over current he dont deal with 3 phase what's quickest way to explain to work it out
Surly the valve orange goes to boiler switch live as all boilers I've worked with need permanent live and they don't need simplifying them
Heatings are the easiest thing to do if u have a basic understanding of electrics
Cables clipped to a brick wall with plasterboard dot n dabbed over them what reference method ?
And any proof as ref c says clipped direct but nic inspector says that means just clipped to a wall the rest of the methods says insulation ?
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.