Recent content by Tronic

  1. Tronic

    Position of the Main switch debate.

    A lot of this trade is interpretation mate, it's good to hear others opinions. On the cert, the section around the "main switch" heading, all the information is relating to the intake position, main earthing/bonding sizes, means of earthing etc. That's how I get to putting the isolator at the...
  2. Tronic

    Position of the Main switch debate.

    I have been having a discussion on site recently : In an industrial situation, in the main intake room which contains the metering equipment, there is a, 60947-3 switch fuse. This feeds a section board complete with MCCB's, which in turn feeds 10 sub boards dotted around the place. When...
  3. Tronic

    NICEIC Certification Scheme NICEIC online form confusion

    I have been having a conversation on site recently : In a factory situation, main intake room which contains the metering equipment, there is a 315A, 60947-3 switch fuse. This feeds a section board complete with MCCB's, which in turn feeds 10 sub boards dotted around the place. When completing...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock